<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: National Infrastructure Commission calls for 2040 exit for unabated gas plants, wants &#8216;energy from waste&#8217; abated</title>
	<atom:link href="https://www.newpower.info/2023/10/national-infrastructure-commission-calls-for-2040-exit-for-unabated-gas-plants-wants-energy-from-waste-abated/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.newpower.info/2023/10/national-infrastructure-commission-calls-for-2040-exit-for-unabated-gas-plants-wants-energy-from-waste-abated/</link>
	<description>Expert information for all those invested in the UK&#039;s energy future</description>
	<lastBuildDate>Fri, 20 Feb 2026 08:08:27 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.6</generator>
	<item>
		<title>By: James</title>
		<link>https://www.newpower.info/2023/10/national-infrastructure-commission-calls-for-2040-exit-for-unabated-gas-plants-wants-energy-from-waste-abated/#comment-95977</link>
		<dc:creator>James</dc:creator>
		<pubDate>Fri, 27 Oct 2023 08:38:46 +0000</pubDate>
		<guid isPermaLink="false">http://www.newpower.info/?p=12850#comment-95977</guid>
		<description><![CDATA[2040?  That’s 40% longer than the previous deadline 2035.
Statements by the NIC (and others) give the impression that, if a plan anticipates substantial quantities of permanent geological storage of captured CO2 from power stations, then such storage is (i) physically and commercially feasible and (ii) guaranteed to the satisfaction of sceptical governments and the public worldwide.  Such plans undermine trust.  Despite long gestation, CC and permanent S at full scale has failed worldwide (despite huge government subsidy and the planetary significance).
Growth (and decline) in the UK market for electricity will be determined by steeply increasing carbon prices (reflect the remaining global carbon budget, equitably allocated), as will availability of materials and labour.]]></description>
		<content:encoded><![CDATA[<p>2040?  That’s 40% longer than the previous deadline 2035.<br />
Statements by the NIC (and others) give the impression that, if a plan anticipates substantial quantities of permanent geological storage of captured CO2 from power stations, then such storage is (i) physically and commercially feasible and (ii) guaranteed to the satisfaction of sceptical governments and the public worldwide.  Such plans undermine trust.  Despite long gestation, CC and permanent S at full scale has failed worldwide (despite huge government subsidy and the planetary significance).<br />
Growth (and decline) in the UK market for electricity will be determined by steeply increasing carbon prices (reflect the remaining global carbon budget, equitably allocated), as will availability of materials and labour.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
